Effectiveness
Fragment of a discussion from Talk:Variable bandwidth
← Thread:Talk:Variable bandwidth/Effectiveness/reply (18)
Jump to navigation
Jump to search
← Thread:Talk:Variable bandwidth/Effectiveness/reply (18)
You do not have permission to edit this page, for the following reasons:
You can view and copy the source of this page.
Return to Thread:Talk:Variable bandwidth/Effectiveness/reply (18).
Hmm... I see. It seems to me that it's easier to factor the baseline hit probability in logically, when the danger calculations work in terms of estimated hit probability.
On the topic of the page this talk page is for... With regards to it not working as well as you would have liked when integrating over an area, I wonder if that might have been related to tuning of bandwidth that is applied before integrating over the area.